The project

In 2010, property developer St. Edward undertook a joint venture with Prudential Insurance to build 339 luxury one, two, and three-bedroom flats, including penthouse suites with concierge and leisure facilities. This ongoing residential development in an area congested with local amenities and cultural attractions is well placed for local transport. EMS (UK) LTD won a contract to provide temporary electrical, lighting, and plumbing services for all phases of this development.

Mind the traffic

The overriding restriction on this project was managing the planned and necessary construction of the new development with the non-stop pedestrian and vehicular traffic in this busy central London locale. The footprint for carrying out construction work was also at a premium, so professional expertise in managing the onsite construction activity and installation and management of site services had to be exercised.

A cost-effective future that began at the start

During the phased handovers on the project, the temporary site services EMS (UK) LTD designed and installed were disconnected strategically with no disruption to the ongoing site works, which allowed St Edward to deliver their project within the agreed timescales. To date, the developer has been able to deliver the scheduled portions of the program within budget, and it is expected that commissioning the dedication and professional strategies EMS (UK) LTD delivers will result in further benefits and resource savings as the development progresses.