Persistent Development of The Battersea Power Station.
The specialist design team at EMS worked closely with the main contractor BPSDC to gauge their site requirements and to produce a scalable, tailored solution that would meet their needs. EMS also delivered and installed an 11KV substation and many thousand meters of high voltage cabling for the site welfare and main construction activities. The high voltage ring main unit serving the substation allowed the de-commissioning of site supplies with no disruption to welfare. EMS also delivered and installed a comprehensive sub-mains distribution system that enabled swift site set-up and managed projected phased handovers of designated site zones without disruption to the ongoing activities.